Harden Boulevard & Pipkin Road Improvements

Polk County BOCC
Lakeland, FL

The limits of this project cover a total of 2.19 miles of road widening and a major intersection signalization and improvement in a highly developed area of Southwest Lakeland.  Chastain-Skillman (CS) was retained to provide the Preliminary Engineering Design Report, Geotechnical Study, Roadway Design Survey, Roadway and Drainage Design, Pavement Marking and Signing Plans, Wetland Mitigation and Floodplain Evaluation, and Environmental Permitting for this project.  Additionally, CS prepared the tabulation of quantities and the preliminary cost estimate for construction and assisted Polk County with the bid process.
The stormwater management facilities consist of major and minor stormwater conveyance systems, one existing detention pond retrofit, and three additional detention/retention ponds.
CS provided assistance to the CEI during the construction process, including preparation of the Statement of Completion and final certification to the Water Management District.