The addition of bike lanes and enhanced drainage along Crystal Lake Drive improved safety for cyclists biking to Lake Hollingsworth.

Chastain Skillman (CS) provided surveying, design, and permitting services for Crystal Lake Drive improvements in Lakeland. This project encompassed approximately 2,200 lineal feet of roadway along Crystal Lake Drive and the intersection with Lake Hollingsworth Drive.

This project included the addition of bike lanes along Crystal Lake Drive with improved drainage infrastructure at the request of the local residents. Corrective milling of the existing roadway was included along portions of the roadway in order to improve both drainage characteristics and to minimize impacts to existing historic trees. In addition, CS provided permitting services. The project was completed in 2016.

$91,000

Design, Permitting, Bidding & Construction Phase Services

$989,000

Construction