
Chastain-Skillman has provided civil engineering services for every parking garage in Downtown Lakeland.
Chastain-Skillman, Inc. (CS) provided surveying and civil engineering for the Heritage Plaza Parking Garage and Office Building in downtown Lakeland. The project includes a 12,860 SF office/retail space as well as a 45,000 SF parking garage.
Our firm provided the topographic survey, site plan, civil site design, construction plans, permitting and limited construction phase services. The site plan included the demolition plan, site grading, erosion control plan and modifications to the existing water and sanitary sewer systems. CS teamed with The Lunz Group for architecture, DIRT Landscape Architecture for landscaping and irrigation design and Madrid Engineering Group, Inc. for geotechnical engineering.
CS coordinated with Southwest Florida Water Management District (SWFWMD), the City of Lakeland, Florida Department of Environmental Protection (FDEP), and the Polk County Department of Health for permitting for the project.



$48,525
Survey, Design, Permitting, Landscape Architecture
and Limited Construction Phase Services
$11M
Construction